Sheperd Construction Switches to Asta Powerproject - free online demos
Shepherd Construction has managed the development of the Grand Arcade in Wigan town centre, to time and to budget, using Asta Powerproject software. The project was one of the first to benefit from the project management software, following the main contractor’s recent switch to Asta Development.
The construction of the new 39,020m2 shopping centre incorporated 35 new shop units and two new car parks providing 825 spaces. As a flagship development for Modus Properties Ltd, it was crucial the development was delivered on time - particularly as the build programme caused an element of disruption to Wigan town centre.
 

 

Mike Hounslow, Managing Planner at Shepherd, said

With Asta Powerproject I was able to manage all aspects of this project accurately and keep it on track. It also allowed me to produce regular progress reports for the client and our senior managers, which are a great communication tool because they are so clear and easy to understand.”

 

Asta Powerproject was used to overcome several challenges at the site, which would otherwise have proved time consuming and costly. The city centre nature of the site complicated the ease with which plant and materials could access and be delivered. For the same reason demolition had to be carried out in a busy city centre environment and then construction took place around existing council buildings. This, combined with the added complication of archaeology digs, mine cappings and an existing 15m drop across the site, meant that the project required stringent management at every stage to avoid the risk of running over time and budget.

Alongside Asta Powerproject, Shepherd Construction also uses Asta Project Viewer, a free tool that enables site managers to view, navigate and print Asta Powerproject plans. Mike said: “The main reason for switching to Asta Powerproject is that it is pretty much used as standard across the construction industry, making it easier to work with clients and trade contractors.

Grand Arcade, Wigan

Watch our free online demos at www.astadev.com/construction