Resource and Cost Management

“Course was well received by all who attended and covered exactly the information that was required. The trainer did well to accommodate the non-users.” David Johnson – Keir Marriott

Course Content

This one-day training course is designed for professionals who need to manage project costs and resources with Asta Powerproject.

Course Objectives

At the end of the course, delegates will be able to allocate costs and resources to tasks and then to report on these allocations using histograms. Resource levelling and modelling is also covered.

Topics

  • Resource and cost libraries
  • Allocating resources and costs
  • Resource modelling
  • Cost and resource histograms
  • Resource levelling
  • Reporting

Duration: 1 day

Course Availability and Location

Course Dates Location Availability
14th January 2014 Thame Spaces available
22nd January 2014 Warrington Spaces available
29th January 2014 London Bridge Spaces available

This course is delivered as an open course for up to 8 delegates at both the Thame and the regional training centres. Closed courses for up to 8 delegates are also available at the Thame training centre or at the customer’s premises.

Need a fully customised training course?

We can run training courses that are customised to your specific requirements. The project management training can based on your own templates and the course notes tailored to reflect the way you run projects. Contact our Training Department now on 01844 263299 or email training@astadev.com

Prices

Open course held at Thame: £250.00 + VAT per delegate
Open course held at Regional training centre: £300.00 + VAT per delegate

Closed course held at Thame: £1000.00 + VAT (maximum of 8 delegates)
Closed course held at Regional training centre: £1250.00 +VAT + travel expenses & room hire

Onsite course: £1250.00 +VAT + expenses (maximum of 8 delegates)

Book Accommodation

Related courses

An Introduction to Asta Powerproject