Course Content
This course is designed for anyone who needs to use Asta Powerproject within the NEC3 contract. Please note that the course does not cover how the contract should be implemented but is focused on the way in which the Asta Powerproject satisfies the contract requirements.
Bob Davis from Carillion talks about NEC contracts
Course Objectives
Through the use of specific exercises and examples, the delegates will gain an understanding of the key functionality of Asta Powerproject that will satisfy the programme requirements of clause 31.2, clause 32.1 and compensation events in core clause 60.1 within the NEC3 contract. It should be noted that the course does not cover how a contract should be implemented. Those attending should be familiar with Asta Powerproject and ideally should have attended the Introduction to Asta Powerproject course.
Topics
- Understanding linking, float and critical path
- Working with ‘terminal float’
- Dealing with time risk allowance
- Baselines
- Dealing with compensation events
- Showing cost implications on prelims as a result of compensation events
- Progress updating
Duration: 1 day
| Course Dates | Location | Availability | |
|---|---|---|---|
| 1st March 2012 | Glasgow | Spaces available | |
| 13th March 2012 | Belfast | Spaces available | |
| 20th March 2012 | Ipswich | Spaces available | |
| 28th March 2012 | Thame | Spaces available | |
| 16th April 2012 | Birmingham | Spaces available |
Courses are priced from £250.00 + VAT per delegate.