Asta Powerproject Enterprise Image

asta site progress

* *

*
*
Click for more * * software
Click for more     asta teamplan
Click for more *   asta powerproject
Click for more     asta powerproject enterprise
   
Click for more asta client reporter
Click for more asta site progress
Click for more     asta easyplan
Click for more     tilos
*
*




 

Walk around construction sites and update project progress into a PDA


Asta Site Progress uses PDA and web technology to enable quick and accurate progress reporting from construction sites.

It is designed to be easy to use, with progress 'ticked off' against a task list for each site. This is done either via a PDA as the site manager walks around the site, or via a web page. The progress is then automatically updated in Asta Powerproject.

This reduces update times and input errors compared to the traditional way of ‘faxing back’ progress updates.

Inputting progress with Asta Site Progress:

  • Report progress quickly and easily from anywhere
    Activities to ‘progress check’ can be presented in the same order that the site manager walks around the site.
  • No on site Internet connection needed
    Download files at the office and then take onto site on a laptop or PDA.
  • Reduces administration
    No longer any need for progress updates to be faxed from site or data rekeyed into the project plans. Also reduce time spent visiting sites to get updates.
  • Improve data accuracy – by automating the process
    Updates are more accurate because they are not re-keyed – giving less margin for human error. The frequency of progress reporting can be selected – daily, weekly, monthly, or ad-hoc.


“ With Asta Siteprogress, our site managers/planners now use a PDA to record progress against tasks as they walk around the site. This information can then be automatically uploaded in Asta Powerproject via the Internet or at local network level.

" The biggest benefit for us is saved time. It used to take us at least one hour to update progress from each site – the link between the PDA and Asta Powerproject takes just a few minutes.”

Kyprianos Kyprianou, Senior Planner, HBG Construction

 

System requirements for Asta Siteprogress:

Web Server

IIS on a machine with NTFS file system.
.Net Framework 1.1 to be installed on IIS server (supplied on CD in dotnet directory)
Minimum Internet Explorer 5.5 installed on IIS server

Microsoft Office 98 or later required, Microsoft Office 2000 or later recommended

Client PC or laptop Asta Powerproject/Teamplan version 8 or higher
Web Client Internet Explorer Version 5.1 or higher
Web Access to the IIS machine where the IIS component has been installed
PDA Pocket PC with Windows Mobile 2003
Docking capability with PC or Laptop
Microsoft ActiveSynch 3.7 or later

 

     
*