Unlike a traditional project management system, TILOS
allows you to plan in two dimensions -- time is represented
on one axis and distance on the other axis.
TILOS plans are easier to understand than traditional
bar charts or network diagrams because they are two dimensional.
A number of TILOS customers produce TILOS plans at the
tender stage which helps them demonstrate to potential
clients their understanding of the project and ability
to deliver.
TILOS allows you to do everything you would with a drawing
package (i.e. CAD ) - plus it includes comprehensive project
management functionality (full scheduling, cost and resource
management including baselines, progress, links, Critical
Path Analysis).
With TILOS, it is easy to produce high quality print-outs
of TILOS charts in any size - including detailed charts
in A3 format, oversized general charts and PDF files.
TILOS includes special features for specific industries
i.e. stoppage calendars for rail. [view screenshot]
Planning with TILOS (as opposed to traditional project
management packages, CAD and/or Excel) saves time - particularly
when revisions to the plan need to be made because both
drawing and scheduling aspects are fully integrated in
one system.
Data can be exchanged easily with
other scheduling systems including Excel, Asta Powerproject,
Primavera/P3 and MS Project. [view
screenshot]
Plan in miles and yards (in addition to standard metric
units).